Q: What are the basic types of DC transmission lines?

A: In terms of its basic structure, HVDC lines can be divided into three types: overhead lines, cable lines and overhead - cable hybrid lines. Dc overhead line has been used more and more in power grid construction because of its characteristics of simple structure, low cost, high utilization rate of corridor, small operation loss, convenient maintenance and meeting the requirements of large capacity and long distance transmission. Therefore, DC transmission lines usually use DC overhead lines, and cable lines are only considered when overhead lines are limited.

Q: What are the key technical issues to be studied in the construction of UHVDC transmission lines?

A: There is no significant difference in mechanical structure design and calculation between DC and AC overhead lines. But in the electrical field, there are many different characteristics that require special study. For the construction of UHVDC transmission lines, attention should be paid to the following three aspects:

1. Corona effect. A certain degree of corona discharge is allowed in the normal operation of THE HVDC transmission line, which will cause corona loss, electric field effect, radio interference and audible noise, leading to the operation loss and environmental impact of the HVDC transmission line. Due to the high voltage, the corona effect of UHV engineering may be larger than that of UHV engineering if it is not properly designed. Based on the research on the characteristics of UHV DC corona, reasonable selection of wire type, insulator string and metal assembly type can reduce corona effect, operation loss and impact on the environment.

2. Insulation coordination. The insulation coordination of HVDC transmission projects has great influence on the investment and operation level of projects. Due to the "electrostatic vacuuming effect" of DC power transmission, the pollution accumulation and flashover characteristics of insulators are very different from those of AC power transmission, and the pollution discharge caused by this is more serious than that of AC power transmission. It is very important to choose the insulation coordination of DC lines reasonably to improve the operation level. As the UHVDC transmission is the first in the world, the existing test data and research results at home and abroad are very limited, so it is necessary to conduct in-depth research on the insulation coordination of UHVDC transmission.

3. Electromagnetic environment impact. The use of UHVDC is of great significance for optimizing resource allocation in a wider range, improving the utilization rate of transmission corridors and protecting the environment. However, compared with UHV projects, UHV DC power transmission projects have the characteristics of high voltage, large wire, tower height, single circuit corridor width and so on. The electromagnetic environment of UHV DC power transmission projects is different from ±500 kV DC lines to some extent. The environmental impact brought about by this is bound to attract the attention of all walks of life. At the same time, the electromagnetic environment of UHVDC engineering is closely related to wire type and wire height. Therefore, it is very important for engineering construction to meet the requirements of environmental protection and reduce the cost to carefully study the electromagnetic environmental impact of UHVDC.

Q: what is the "electrostatic vacuuming effect" of DC?

A: Under dc voltage, charged particles in the air will be absorbed to the surface of the insulator under the action of constant direction electric field force, which is the "electrostatic vacuuming effect" of DC. Because of its effect, under the same environmental conditions, the amount of pollution on the surface of dc insulator is more than twice that of ac voltage. With the increase of pollution, the insulation level decreases, and pollution flashover of insulators is easy to occur under certain weather conditions. Therefore, due to the technical characteristics of DC transmission lines, compared with AC transmission lines, their external insulation characteristics are more complex.

Q: What problems should be solved in insulation coordination design of HVDC transmission lines?

A: Insulation coordination design of HVDC transmission line is to solve all kinds of possible gap discharge in the center of line pole tower and gear distance, including conductor to pole tower, conductor to lightning conductor, conductor to ground, and insulation selection and coordination between conductors of different poles. The specific contents are as follows: In order to meet the reasonable insulation level of HVDC transmission line, the insulator type and the number of insulator strings, the air clearance of tower head and the distance between pole conductors are selected according to different engineering and atmospheric conditions.

Q: How is the number of insulators for a DC transmission line determined?

A: Due to the electrostatic adsorption of DC lines, the pollution level of DC lines is higher than that of AC lines under the same conditions, and the number of insulators is also more than that of AC lines. The insulation level is mainly determined by the pollution discharge characteristics of insulator strings. Therefore, there are two main methods to select the number of insulators at present: 1. According to the artificial pollution test of insulators, the insulator pollution tolerance method is adopted to measure the pollution lightning pressure of insulators under different salt densities, so as to determine the number of insulators. 2. Creepage specific distance method is adopted according to operation experience. In general, the creepage specific distance of DC line is twice that of AC line. Of the two methods, the former is intuitive, but requires a large amount of test and detection data, and the results of test and detection are highly dispersed. The latter is simple and convenient, but less accurate. In practice, the two are usually combined.

Q: How to select the conductor type of UHVDC transmission line?

Answer: In the UHVDC transmission project, the selection of wire type must meet the requirements of environmental protection in addition to safe long-distance transmission of electric energy. Among them, the limit of line electromagnetic environment becomes the most important factor in wire selection. At the same time, economically speaking, the choice of wire type is also directly related to the project construction investment and operation cost. So UHV dc conductor cross section and division of research, in addition to meet the economic current density and allows the carrying capacity of the request for a long time, but also in consideration of the electromagnetic environment limits and under the condition of construction investment, operating loss, by way of different structure, the conductor surface field strength under different altitude, and the halo voltage computing research, The electric field intensity, ion current density, audible noise and radio interference are analyzed to determine the final wire splitting pattern and sub-wire cross section. For ±800 kV UHV DC engineering, in order to meet the environmental impact limit requirements, especially the requirements of audible noise, the wire structure of 6×720 square mm or above should be used.

Q: How to determine the corridor width of UHVDC transmission line and the demolition range of houses adjacent to the line?

Answer: The corridor width of UHVDC transmission line is mainly determined by two factors: 1. The requirement of ensuring electrical clearance when the conductor has the maximum wind deviation; 2. 2. Meet the requirements of electromagnetic environment indicators (including electric field intensity, ion current density, radio interference, and audible noise). According to the characteristics of the line erection, the most serious influence is in the center of the file distance. The research shows that for the UHV DC project, when the line is near the houses, the demolition measures can be taken to ensure that the electrical clearance and environmental impact of the project can meet the requirements of the national regulations. Usually, the indicators of electric field intensity, ion current density, radio interference and audible noise should be calculated when the feasibility study is carried out at the initial stage of engineering construction. Only when these indicators meet the relevant national regulations can the project be approved.

電 話
產(chǎn) 品
短 信
聯(lián) 系
欧美国产视频日韩_韩国19禁主播vip福利视频_日本精品免费一区二区三区_亚洲国产欧美久久
国产欧美视频一区二区| 亚洲国产欧美一区二区三区丁香婷| 成人精品国产福利| 中文字幕一区二区三区不卡 | 欧洲在线/亚洲| 日韩电影在线一区二区三区| 久久众筹精品私拍模特| 99精品视频在线观看| 亚洲成人午夜电影| 国产亚洲精品bt天堂精选| 一本一道波多野结衣一区二区| 五月天激情综合| 国产人伦精品一区二区| 91久久精品网| 美女www一区二区| 中文字幕一区二区三区精华液| 欧美精品一卡两卡| 成人免费观看av| 亚洲成人自拍一区| 国产日本欧洲亚洲| 欧美日韩高清一区| 成人免费三级在线| 日韩国产欧美在线视频| 国产精品女同互慰在线看| 欧美日韩国产免费一区二区| 国产精品一二一区| 午夜精品久久一牛影视| 国产精品网站在线播放| 欧美日本一区二区| 成人av免费在线| 美日韩一区二区| 一区二区三区在线播| 久久综合一区二区| 欧美日韩一区在线| 大白屁股一区二区视频| 日本在线播放一区二区三区| 亚洲欧洲一区二区三区| 精品国产在天天线2019| 欧洲色大大久久| 丁香一区二区三区| 美腿丝袜亚洲三区| 亚洲一级电影视频| 中文字幕日韩av资源站| 亚洲精品在线电影| 777亚洲妇女| 色狠狠综合天天综合综合| 国产伦精品一区二区三区免费迷| 亚洲成人福利片| 亚洲人午夜精品天堂一二香蕉| 精品av综合导航| 欧美日韩电影在线播放| 91麻豆精东视频| 国产精品白丝jk黑袜喷水| 日产国产高清一区二区三区| 亚洲欧美日韩国产综合在线| 久久久久88色偷偷免费| 日韩一区二区免费视频| 欧美视频一二三区| av午夜精品一区二区三区| 国产精品一区二区三区四区| 美洲天堂一区二卡三卡四卡视频| 亚洲va欧美va人人爽午夜| 亚洲欧美另类综合偷拍| 欧美高清在线视频| 久久人人爽人人爽| 日韩一区二区免费在线观看| 欧美精品亚洲二区| 欧美视频一区在线观看| 日本精品一区二区三区四区的功能| 粉嫩一区二区三区在线看| 人人爽香蕉精品| 丝袜美腿亚洲综合| 亚洲国产精品一区二区www| 亚洲免费观看高清完整| 1024亚洲合集| 亚洲丝袜制服诱惑| 国产精品成人一区二区三区夜夜夜 | 99久久精品国产导航| 国产不卡在线视频| 国产精品一区专区| 韩国理伦片一区二区三区在线播放| 奇米影视在线99精品| 日本中文字幕不卡| 青青草97国产精品免费观看 | 午夜一区二区三区视频| 亚洲国产一区二区三区| 亚洲综合成人在线视频| 一区二区三区美女| 亚洲一区二区欧美| 亚洲不卡一区二区三区| 亚洲成人自拍网| 午夜伊人狠狠久久| 日本美女一区二区三区视频| 热久久久久久久| 视频精品一区二区| 日本怡春院一区二区| 免费一级欧美片在线观看| 午夜欧美2019年伦理| 午夜视频久久久久久| 日本欧美一区二区在线观看| 美女网站视频久久| 韩国成人在线视频| 国产一区二区网址| 国产精品自产自拍| 粉嫩在线一区二区三区视频| 99久久精品免费| 91在线观看地址| 欧美曰成人黄网| 欧美剧在线免费观看网站| 91麻豆精品国产91| 欧美xxxx在线观看| 国产日本一区二区| 亚洲精品写真福利| 亚洲不卡av一区二区三区| 日本伊人色综合网| 极品少妇一区二区| 成人夜色视频网站在线观看| 91伊人久久大香线蕉| 欧美日韩国产一二三| 精品女同一区二区| 中文字幕不卡在线播放| 亚洲精品成人a在线观看| 亚洲国产成人va在线观看天堂 | 美女尤物国产一区| 国产毛片一区二区| 97se亚洲国产综合自在线| 欧美日韩另类国产亚洲欧美一级| 日韩一区二区在线看| 国产蜜臀av在线一区二区三区| 亚洲人成7777| 免费人成在线不卡| 大美女一区二区三区| 欧美亚洲愉拍一区二区| 欧美成人三级电影在线| 中文字幕一区二区三区乱码在线| 亚洲成a人片综合在线| 老司机精品视频一区二区三区| 国产精品一区二区在线看| 色综合久久88色综合天天| 欧美一区二区三区视频免费| 国产亚洲欧美一区在线观看| 亚洲精品欧美专区| 久久99国产精品久久99果冻传媒| 成人精品电影在线观看| 欧美日韩精品一区二区天天拍小说| 日韩欧美一二三区| 亚洲欧洲日韩女同| 日韩va欧美va亚洲va久久| 国产激情91久久精品导航| 在线观看日韩一区| 久久综合九色综合久久久精品综合| 亚洲欧洲日产国码二区| 美女视频网站久久| 99精品国产热久久91蜜凸| 日韩一区二区在线观看视频播放| 中文字幕在线不卡国产视频| 三级在线观看一区二区| 成人免费看视频| 欧美一区二区三区喷汁尤物| 国产精品卡一卡二卡三| 三级亚洲高清视频| 99久久精品免费看国产| 精品国产一区二区三区忘忧草 | 亚洲精品写真福利| 国产一区二区日韩精品| 91福利区一区二区三区| 欧美丰满高潮xxxx喷水动漫| 国产精品午夜在线| 蜜桃精品在线观看| 91久久久免费一区二区| 久久精品人人爽人人爽| 天天影视色香欲综合网老头| 99久久精品久久久久久清纯| 久久亚洲二区三区| 亚洲成人av电影| caoporn国产精品| 久久亚洲私人国产精品va媚药| 亚洲国产综合视频在线观看| 成人毛片视频在线观看| 欧美sm美女调教| 亚洲国产欧美在线| 91污在线观看| 国产欧美日韩激情| 久久精品国产**网站演员| 欧美三级在线视频| 亚洲欧洲三级电影| 国产不卡在线播放| 欧美精品一区二区久久婷婷| 视频精品一区二区| 欧美亚洲国产bt| 亚洲色图色小说| 成人天堂资源www在线| 26uuu久久天堂性欧美| 日韩中文字幕av电影| 欧美在线不卡视频| 亚洲欧洲综合另类| 成人爱爱电影网址| 国产三级三级三级精品8ⅰ区| 免费国产亚洲视频| 777精品伊人久久久久大香线蕉|